BASA VD-AK-149
One-component top paint based on polyacrylic resin. Used for top painting of mineral surfaces, including concrete and reinforced concrete structures for the protection and decorative appearance. Recommended for anti-corrosion protection of concrete and reinforced concrete in transport facilities. It can be used for long-lasting painting of products made of corrugated asbestos board and tiling, as well as for facades and indoor environment of buildings and structures made of concrete and brick. Fire-explosion-proof, does not contain toxic components
Technical specifications | |
Type | One-component top paint based on polyacrylic resin |
Hardener | 1,2 |
Relative viscosity at a temperature of 20±2ºС by the VZ-246 viscometer with a nozzle diameter 4 mm, not less | 60 |
Water resistance | Resistance of the film to static effect of water at a temperature of 20°C, not less than 12 hours |
Non-volatile matter content, not less % | 50 |
Color |
White Color matching according to RAL / NSC color systems etc. is possible |
Glossiness | Matt (ISO 2813/60º) |
Consumption, g/m2 |
125 - 250 The practical consumption is influenced by the quality of a surface, a way and conditions of application, a form of the painted surface |
Solvent | Potable water |
Way of application | Air spraying, airless spraying, long pile brush or roller |
Time of drying to degree 3 at a temperature of +20ºС and relative humidity of 65%, not more, hours | 1,0 |
Instruction for use | |
Conditions of applying | Temperature of air, the painted surface and paint should not be lower than +5ºС. Temperature of a surface should be at least 3ºС higher than an air dew point. Relative humidity of air should be at least 80%. Do not apply to the surface if rain or night frost can occur within 24 hours |
Surface preparation | The surface must be dry before painting: there should be no film moisture, the surface must be moisture-air free by touch. Before priming, chalky surfaces should be cleaned until chalk or lime is completely removed |
Priming | Apply Primer VD-UR-0115 with the recommended thickness in accordance with the specification |
Method of application | Before use, the paint should be mixed thoroughly, avoiding the formation of foam. If necessary, dilute with water. Apply with spraying, with a brush or roller |
Recommended paint systems | |
Tools cleaning | When finished, the paint equipment and tools should be washed out with water |
More information | |
Occupational & industrial safety | Before application it is necessary to study attentively the text and precautionary designations on factory labels. Use in well-ventilated rooms. Do not inhale dust. Avoid contacts with skin. In case of skin and eye exposure, immediately rinse with water and see a doctor |
Storage | The paint should be stored and transported at a temperature above +5ºС. The packed product should be stored in the dry, cool, well-ventilated room, away from heat sources. Package should be tightly closed. Freezing and defrosting of the product will result in deterioration of the product |
Paint system BASA-CONCRETE 20
Production name | Thickness, mkm |
---|---|
Primer VD-UR-0115 | 80-120 |
Paint VD-AK-149 | 80-120 |
Total thickness | 160-240 |
The Scientific Research Institute of Transport Construction was established in 1935, in 1993 it was transformed into a joint-stock company.
All these years, ZNIIS JSC provides reliability and security of construction and operation of complex and unique facilities.
The standard of the Institute is absence of complaints and unconditional fulfillment of obligations. That's why a significant part of our customers cooperate with ZNIIS JSC for years and decades. Since 2002 it has been accredited by TÜV (Germany) in accordance with ISO 9001 standard.
The institute has specialized laboratories and professionals in the field of certification of new building materials, corrosion protection, vibration protection, calculations and physical modeling of complex structures, testing of materials and structures.