BASA VD-AK-115
Water-dispersive paint, based on polyacrylic resin, top coat, for the anti-corrosion protection of reinforced concrete structures of transport facilities and other mineral surfaces.
One-component fast-drying paint based on polyacrylic resin for exterior and interior work.
Used for top painting of mineral surfaces, including concrete and reinforced concrete structures in transport constructions, when newly built or restored, as well as in residential and public buildings.
Weatherproof, resistant to the change of temperature. Fire-explosion-proof, does not contain toxic components.
Technical specifications | |
Type | One-component fast-drying paint based on polyacrylic resin for exterior and interior work. |
Hardener | 1,25 |
Relative viscosity at a temperature of 20°C by the VZ-246 viscometer, not less, sec. | 60 |
Resistance of the film to static effect of water at a temperature of 20°C not less than 12 hours | 12 |
Freezing resistance | Not less than 5 cycles at a temperature of minus 40ºС |
Non-volatile matter content, not less % | 50 |
Color |
White Color matching according to RAL /NSC color systems etc. is possible. |
Glossiness | Matt (ISO 2813/60º) |
Consumption, g/m2 |
120-250 The practical consumption is influenced by the quality of a surface, a way and conditions of application, a form of the painted surface |
Solvent | Potable water |
Way of application | Air spraying, airless spraying, long pile brush or roller at strip painting. |
Time of drying to degree 3 at a temperature of not less than +20oC±2С and relative humidity of 65%, not more, hours | 1,0 |
Instruction for use | |
Conditions of applying |
Temperature of air, the painted surface and paint should not be lower than +5ºС.
Temperature of a surface should be at least 3ºС higher than an air dew point. Relative humidity of air should be at least 80%. Before priming, the newly applied plaster can be painted after full curing, not earlier than after two weeks at a temperature of not less than +5°C and relative humidity not exceeding 80%. Do not apply to the surface if rain or night frost can occur within 24 hours. |
Surface preparation |
The surface must be dry before painting: there should be no film moisture, the surface must be moisture-air free by touch.
Chalky surfaces are cleaned until chalk or lime is completely removed. |
Priming | Apply one of the Primers BASA - VD-AK-0110 or VD-AK-0125 or other, with the recommended thickness in accordance with the specification, |
Method of application |
Before use, the paint should be mixed thoroughly, avoiding the formation of foam.
If necessary, dilute with water not more than 5% of its volume. |
Recommended paint systems | |
Tools cleaning | When finished, the paint equipment and tools should be washed out with water. |
More information | |
Occupational & industrial safety |
Before application it is necessary to study attentively the text and precautionary designations on factory labels.
Use in well-ventilated rooms. Do not inhale dust. Avoid contacts with skin. In case of skin and eye exposure, immediately rinse with water and see a doctor. |
Storage |
The paint should be stored and transported at a temperature above +5ºС.
The packed product should be stored in the dry, cool, well-ventilated room, away from heat sources. Package should be tightly closed. Freezing and defrosting of the product will result in deterioration of the product. |
Paint system BASA-CONCRETE 10
Production name | Thickness, mkm |
---|---|
Primer VD-AK-0110 | |
Paint VD-AK-115 | 80-120 |
Total thickness | 160-240 |
The Scientific Research Institute of Transport Construction was established in 1935, in 1993 it was transformed into a joint-stock company.
All these years, ZNIIS JSC provides reliability and security of construction and operation of complex and unique facilities.
The standard of the Institute is absence of complaints and unconditional fulfillment of obligations. That's why a significant part of our customers cooperate with ZNIIS JSC for years and decades. Since 2002 it has been accredited by TÜV (Germany) in accordance with ISO 9001 standard.
The institute has specialized laboratories and professionals in the field of certification of new building materials, corrosion protection, vibration protection, calculations and physical modeling of complex structures, testing of materials and structures.